Metrorail weekend service for Saturday, June 3 through Sunday, June 4
Advisory Effective: 6/3/23 - 6/4/23
Saturday, June 3 - Sunday, June 4
Hours: Sat 7 a.m. - 1 a.m.; Sun 7 a.m. - midnight
Service: Normal service
Trains operate every 8 minutes between Shady Grove and Silver Spring, and every 16 minutes between Silver Spring and Glenmont (Saturday); every 8 minutes until approximately 10 p.m., then every 10 minutes until closing (Sunday)
Trains every 8 minutes between Ashburn and McLean until approximately 10 p.m., then every 10 minutes until closing; every 15 minutes between Ballston and Downtown Largo until closing
Maintenance:
Single tracking between Silver Spring and Forest Glen (Saturday)
Shutdown between Ballston and McLean
At stations served by multiple lines in the central core of the system, trains will arrive on average every 4-8 minutes.
Service Information:
Red Line
- Sat: Trains operate every 8 minutes between Shady Grove and Silver Spring with every other train continuing on to Glenmont providing service every 16 minutes between Silver Spring and Glenmont.
- Sun: Trains operate every 8 minutes until approximately 10 p.m., then every 10 minutes until closing.
Scheduled maintenance & service adjustments (Saturday)
- Single tracking between Silver Spring and Forest Glen due to tunnel teak mitigation.
Blue Line
- Trains operate every 15 minutes until closing.
Orange Line
- Trains operate every 15 minutes between Ballston and New Carrollton until closing.
Scheduled maintenance & service adjustments
- Shutdown between Ballston and Vienna due to rail replacement and fiber-optic cable installation.
- Vienna, East Falls Church, West Falls Church, and Dunn Loring stations closed.
- Shuttle bus service provided between Ballston and Vienna.
- For detailed information and travel alternatives, visit here.
Silver Line
- Trains operate every 8 minutes between Ashburn and McLean until 10 p.m., then every 10 minutes; and every 15 minutes between Ballston and Downtown Largo until closing.
Scheduled maintenance & service adjustments
- Shutdown between Ballston and McLean due to rail replacement and fiber-optic cable installation.
- East Falls Church station closed.
- Shuttle bus service provided between Ballston and McLean.
- For detailed information and travel alternatives, visit here.
Yellow Line
- Sat: Trains operate every 12 minutes between Huntington and Mt. Vernon Sq until closing.
- Sun: Trains operate every 8 minutes between Huntington and Mt. Vernon Sq until closing.
Green Line
- Trains operate every 8 minutes until closing.
For more information:
Schedules, real-time train arrivals and station information are available at wmata.com. For assistance by phone, call Metro customer information at (202) 637-7000 [TTY 202-638-3780].