Solicitation Details
Solicitation CQ17061/MW Amendment 001 and 002
Track Geometry/Third Rail Inspection
Status: Closed
Posted on 01/13/2017
Due on 02/13/2017
Contract Administrator: Wilson, Melloney
Email Address: MWILSON@wmata.com
Synopsis
WMATA has a two (2) times per year minimum requirement for Track Geometry/Third Rail Inspection requirement for mainline track and a one (1) time per year minimum for yard track. This multi-year (1 Base, 3 Option) on-call testing requirement is for a contractor to provide all necessary labor, tools, materials, and equipment required to automatically inspect WMATA rail system utilizing a hi-rail or rail bound vehicle to collect track geometry measurements.
Attachments
IFB Template (Non-Federal) Track Geometry Third Rail Inspection Services January 5, 20171.pdf
A001, CQ17061MW, signed copy.pdf
A002, CQ17061MW, signed copy.pdf
Award Information
Vendor Name | Award Date | Award Amount | Attachment |
---|---|---|---|
ENSCO Rail, Incorporated | 06/08/2017 | $548,400.00 |