Solicitation FQ15237R/GG

Six (6) Tie Breaker Station Upgrades on Orange and Blue Lines DC, MD and VA

Status: Closed
Posted on 03/04/2016
Due on 03/18/2016
Contract Administrator: Gufranova, Guzel
Email Address: ggufranova@wmata.com

Synopsis

The Washington Metropolitan Area Transit Authority (WMATA) requests your bid for the furnishing of labor, materials, equipment, tools, project management, supervision, engineering, quality control, testing, transportation, safety, appurtenances and other items necessary for the Six (6) Tie Breaker Stations Upgrade Orange and Blue Lines, VA, DC and MD.

The solicitation includes but is not limited to:

-Replace metal enclosed DC switchgear as complete switchgear lineups. -Remove and replace existing DC switchgear insulated floor topping. -Connect equipment to existing DTS and ETS relay panels. -Replace battery chargers, battery plants, DC panel-boards, and associated equipment as indicated on the drawings. -Replace existing lighting fixtures and add new lighting fixtures -Install new power circuits (wire and conduit) within the tie-breaker stations - 600 volt AC circuits -Provide materials including conduits, cable trays, and support hardware. -Provide grounding and bonding as specified and as required. -Replace equipment and upgrade panelboard and feeder capacity within the tie-breaker stations as indicated on Contract Drawings. -Install 3KVA isolation transformer and materials to provide ungrounded 120 VAC power circuits from normal power sources to supply heaters within DC switchgear assemblies. -Install, and subsequently remove, temporary jumper cables and associated connections to facilitate temporary power provisions during replacement of existing DC switchgear. -Furnish and install SCADA equipment (Distributed Input Output Modules (DIO) and Digital Trace Recorders (DTR)) as indicated on the Contract Drawings. -Provide all equipment, testing, labor, cables, connections, etc. to complete all work required on the construction documents. Provide the total recommended spare parts list with unit price costs associated, and total overall estimate

WMATA DBE Participation Goal: 18.5%.

Attachments

FQ15237R Volume 1 Bidding and Contracting Requirements.pdf
Volume 2 FQ15237R Technical Provisions.pdf
FQ15237R Volume 3A Drawings.pdf
FQ15237R Volume 3B Drawings.pdf
FQ15237R Volume 4 WMATA Standard Drawings. Contact Rail Schematics.pdf
Appendix K Period of Delay Time Sheet.pdf
Appendix L General Orders and Track Rights System (GOTRS) Request Form.pdf
Appendix M Switch Order Form.pdf
Appendix O MSDS Review Request Form1.pdf
Appendix P Site Specific Work Plan (SSWP) 200-331.pdf
Appendix Q Site Specific Work Plan (SSWP) Form1.pdf
FQ15237R _Tabulation of Bids.pdf

Award Information

Vendor NameAward DateAward AmountAttachment
Clark Construction Group, LLC07/01/20165,046,000