Solicitation Details

Solicitation FQ15206/KKB

Construct Rail Cars Access Platforms At New Carrollton, West Falls Church

Status: Closed
Posted on 07/10/2015
Due on 09/02/2015
Pre-Proposal Conference Date on 08/12/2015
DBE Participation Goal: 15%
Contract Administrator: Banjo,Kamoru
Email Address: kkbanjo@wmata.com

Synopsis

The Washington Metropolitan Area Transit Authority (WMATA) requests your bid for the furnishing of labor, materials, equipment, tools, project management, supervision, engineering, quality control, testing, transportation, safety, appurtenances and other items necessary for the work contained in the IFB.

This Invitation for Bid (IFB) includes work at the following facilities and which must be fully compatible with and integral to existing WMATA systems:

1. D90 – New Carrollton Maintenance Facility (NC)

2. K90 – West Falls Church Maintenance Facility (WFC)

The scope of work includes:

BASE WORK

1. New Carrollton Maintenance Facility (NC)

• Selective demolition of structural and traction power members to facilitate construction, testing, and commissioning of facility renovations indicated in the Contract Documents that will allow access to HVAC units mounted on top of WMATA’s new 7000 series railcars • Construction of 2 steel catwalks, ships ladders, railings, motorized swing gates, sliding gates, and vertical swing vehicle rooftop access platform. • Modifications to the existing compressed air, fire suppression, and domestic water systems. • Electrical modifications that include installing convenience outlets and providing an electrical interlock between an existing Whiting Corporation car hoist and the new motorized swing gates; and coordination with Whiting Corporation to determine interlock requirements.

OPTION WORK

2. West Falls Church Maintenance Facility (WFC)

- Selective demolition of structural and traction power members to facilitate construction, testing, and commissioning of facility renovations indicated in the Contract Documents that will allow access to HVAC units mounted on top of WMATA’s new 7000 series railcars. - Construction of 2 steel catwalks, ships ladders, railings, motorized swing gates, and sliding gates. - Construction of a new stinger system in the catwalk area as indicated in the Contract Documents. - Modifications to the existing compressed air, fire suppression, and domestic water systems. - Electrical modifications that include installing convenience outlets.

Estimate Cost Range: $4,000,000 - $8,000,000

Period of Performance: All work must be complete within 660 calendar days after the issuance of Notice-to-Proceed.

After downloading this solicitation, you are required to email your company’s name, point contact, address, phone, and fax numbers to kkbanjo@wmata.com with subject reading "IFB FQ15206/KKB-Construct Rail Cars Access Platforms"

Attachments

FQ15206 PRESOLICITATION NOTICE.pdf
FQ15206 PRESOLICITATION NOTICE_Rev 1.pdf
FQ15206KKB_8-05-2015.pdf
Technical Specifications_08-05-2015.pdf
1-7Drawings.pdf
8-15Drawings.pdf
16-24Drawings.pdf
25-32Drawings.pdf
33-40Drawings.pdf
41-48Drawings.pdf
49-55Drawings.pdf
56-62Drawings.pdf
63-69Drawings.pdf
70-76Drawings.pdf
77-83Drawings.pdf
84-90Drawings.pdf
Amendment-001.pdf
RevisedAM-001.pdf
RFI.pdf

Award Information

Vendor NameAward DateAward AmountAttachment
Potomac Construction Co., Inc.03/11/2016$4,517,905

Return to list