Solicitation Details

Solicitation FQ15191/ER

GENERAL ARCHITECTURAL AND ENGINEERING CONSULTANT SERVICES - FACILITIES IDIQ

Status: Closed
Posted on 04/23/2015
Due on 10/14/2015
Pre-Proposal Conference Date on 05/04/2015
Contract Administrator: Roper, Errol
Email Address: eroper@wmata.com

Amendments

NumberDateDescriptionAttachment
709/04/2015THE PURPOSE OF THIS AMENDMENT IS TO EXTEND THE BID DUE DATE FROM SEPTEMBER 9, 2015 TO SEPTEMBER 30, 2015. FQ15191 Amendment A007.pdf
809/28/2015This Amendment extend the Bid Due Date and amend certain sections of the Solicitation.FQ15191 Amendment A008.pdf

Synopsis

The Washington Metropolitan Area Transit Authority (WMATA) requires the services of a qualified firm to provide architectural, engineering, and design services to include, but not limited to, program management, construction management, feasibility studies, preliminary engineering, design engineering, surveying, mapping, or other related services for support of the WMATA facilities management program. These other services may include professional engineering related services, or incidental services that may be performed by a professional engineer, or individuals working under their direction, who may logically or justifiably perform these services.

The General Architectural and Engineering Consultant (GAEC) shall assist the Authority by providing certain professional engineering, architectural and surveying services associated with new construction and the renovation, repair and maintenance of Authority facilities located in the District of Columbia, Maryland and Virginia.

This solicitation shall be conducted in accordance with the Brooks Act. Award will be made to the offeror who is determined to be the highest qualified, is deemed responsible, whose proposal conforms to the solicitation’s requirements, and who is judged, by the Contractor Evaluation Board’s (CEB) assessment of the specific criteria, defined in Article 18, to best meet the Authority’s requirements at a reasonable price.

It is anticipated that one contract will be awarded from this solicitation for an estimated total aggregate value of $120,000,000, and will have a 24 month base period plus three (3) twelve (12) month option periods. A Minimum Guarantee amount of $2,500 will apply to the Base Period only.

Only Architect or Engineering firms may compete for this contract. Firms are required to submit documentation that the firm is an architect or engineering firm and is to provide that documentation in Section H of the SF330. Documentation can be the firm’s engineering registration number from a State Board of Professional Engineers if the State in which the firm is located has a firm registration requirement, or it can be resumes of the senior engineers/architects that are managing the firm showing that they are registered engineers or architects.

A pre-proposal conference will be held at 1:00 p.m. on May 4, 2015, in the lobby level cafeteria of Carmen Turner Facility, 3500 Pennsy Drive, Hyattsville, MD 20785.

If you have any questions, Technical, Contractual, or Administrative, please e-mail them to com-inbound-a--e-idiq-gec--facilities@procoretech.com no later than 2:00 PM, May 8, 2015. WMATA will provide written answers via an amendment to the solicitation posted on our website.

Your proposal must be received with all required submittals as stated in the RFP, no later than 2:00PM, May 20, 2014, at WMATA, Office of Procurement and Materials, 600 Fifth Street, NW, Room 3C-02, Washington, DC 20001-2651.

54131 54131 54133 54133 1119

Attachments

FQ15191 AE GEC RFP.pdf
FQ15191 ATTACHMENT B - Certificate of Current Cost or Pricing Data.docx
FQ15191 ATTACHMENT C - REPS AND CERTS.pdf
FQ15191 ATTACHMENT D - PRE-AWARD DATA FORM.pdf
FQ15191 ATTACHMENT A - BILLING RATE TABLE.pdf
FQ15191 ATTACHMENT A - BILLING RATE TABLE.xlsx
FQ15191-A001 TRACKED CHANGES.pdf
FQ15191-Conformed RFP.pdf
FQ15191ER Pre-Proposal Conference Attendee's List.pdf
FQ15191 Amendment A001.pdf
FQ15191 Amendment A002.pdf
FQ15191 Amendment A003.pdf
FQ15191 Amendment A004.pdf
FQ15191 Amendment A005.pdf
FQ15191 Amendment A0062.pdf
Response to the RFIs.pdf

Return to list