Vienna Escalator Replacement
Advisory Effective: 6/3/24 - 5/31/25
In June 2024, Metro began a major capital project replacing three platform escalators at Vienna. The three escalators will be replaced with brand-new ones that are more durable and reliable. The escalators are being installed as part of an ongoing Escalator Replacement Project to replace 139 escalators across the Metrorail system by 2028.
How will this work affect my trip?
Escalators at Vienna Station will be replaced one at a time. While one escalator is being replaced, the remaining two escalators will be operational with one escalator going up and one escalator going down. Occasionally, the escalator adjacent to the one being replaced may be turned off and used as a two-way staircase.
Station entrances, as well as the elevator and stairs from the mezzanine to the platform, will remain open throughout construction.
How long will the project take?
The escalator replacement is expected to be complete in May 2025.
How can I stay informed about the project?
Additional information can be found on the Escalator, Canopy and Elevator project page. Customers are also encouraged to sign up for MetroAlerts text or email messages to receive project updates and service information or contact Customer Relations at 202-637-7000 with additional questions.
에스컬레이터 교체 사업에 대한 자세한 내용은 메트로 고객 서비스 전화인 202-637-7000번으로 문의하십시오.
欲了解有关自动扶梯更换项目的更多信息,请致电 Metro 的客户服务热线 202-637-7000。
「欲了解更多有關自動扶梯更換專案的資訊,請致電 Metro 的客戶服務熱線 202-637-7000。」
للحصول على معلومات إضافية حول مشروع استبدال السلالم المتحركة، يرجى الاتصال بخط خدمة عملاء مترو على٢٠٢٦٣٧٧٠٠