Thru tonight's closing, trains are operating every 9 to 18 minutes with single tracking between Van Ness and Friendship Heights because of planned work. Every other train will turnback at Farragut North to minimize train traffic.
Construction Impacts
生效时间: Jul. 28, 2025 - Jun. 28, 2027
Bethesda
R
Metro 正在 Bethesda 站南端建设一个新的夹层,以连接 Metro Rail 与未来的紫线 Bethesda 站。夹层要等到2027年紫线开通后才会开放。