This weekend, free shuttles replace trains between National Airport and Pentagon City due to the Crystal City entrance construction project. As a result, Crystal City station is closed.
Canopy and Stairway Project
Effective: Nov. 17, 2025 - Sep. 30, 2026
U St
YG
Noong Nobyembre 17, 2025, sinimulan Metro ang Phase 4 upang mai-install ang canopy sa itaas ng mga escalator ng istasyon sa U Street Station.
Crystal City station will be closed over ten separate weekends until June 2026 as part of the Crystal City second entrance construction project. During impacted weekends, Metro will provide free shuttle buses at impacted stations.
Noong Agosto 17, 2025, sinimulan Metro ang pag-modernize ng mga escalator sa West Hyattsville Station. Ang trabaho ay aabutin ng humigit-kumulang sampung buwan upang makumpleto, at ang isang escalator ay mawawalan ng serbisyo nang paisa-isa.
Tatlong escalator sa Entrance C (9th St, L'Enfant Plaza) ang pinalitan. Ang inaasahang pagkumpleto ay Agosto 2026. Sa panahon ng konstruksiyon, isasara ang isang escalator nang paisa-isa. Bukas ang lahat ng entrance at elevator.
Ang mga elevator sa magkabilang panig ng pedestrian bridge na tumatawid sa East-West Hwy malapit sa Hyattsville Crossing Station, ay isinara nang walang hanggan. Mananatiling bukas ang pedestrian bridge at hagdanan.