Status and Alerts

Current Alerts

MORE DETAILS
Route/Line Issue Impact Last Updated

Planned Changes

Events & Announcements

MORE OPTIONS

Service Changes & Station Construction

Route/Line What's Happening Issue Start Date End Date
station icon
L'Enfant Plaza

Escalator Closed In May 2024, Metro continued a major capital project replacing entrance escalators: three at Entrance B (6th St) from late May 2024 to June 2025 and three at Entrance C (9th St) from June 2025 to August 2026.

Show Details
05/17/2024 08/31/2026
station icon
Silver Spring

Rail Station Construction MDOT MTA Purple Line construction crews continue to work on a new mezzanine that will connect the future station to Metro, MARC, and the transit center. Expect construction through 2026.

Show Details
04/13/2023 12/31/2026
station icon
Judiciary Square

Entrance/Exit Inhibited In January 2023, Metro began a capital project to install a new staircase and canopy at Judiciary Square’s north entrance. The stairway is scheduled to open in spring 2026 and canopy construction will begin spring 2026.

Show Details
01/01/2023 12/31/2026
station icon
Arlington Cemetery

Rail Station Construction In June 2023, Metro began a major capital project to install two canopies above the station escalators.

Show Details
06/01/2023 03/31/2026
station icon
Fort Totten

Parking Changes 50% of the Kiss & Ride Lot at Fort Totten Station closed for repairs. During this time, daily parking is available in the Park & Ride (rates apply).

Show Details
09/01/2024 12/31/2025
station icon
Rosslyn

Escalator Closed In January 2024, Metro began a major capital project replacing the four entrance escalators and four platform escalators at Rosslyn Station –all eight escalators are expected to be completed by May 2026.

Show Details
01/02/2024 06/30/2026
station icon
Southern Avenue

Parking Changes In June 2024, Metro began reconfiguring the Kiss & Ride Lot and reopened the lower level of the Park & Ride Lot. Up to 85% of parking spaces in the Kiss & Ride Lot will close indefinitely; but daily parking is available in the Park & Ride (rates apply).

Show Details
06/24/2024 12/31/2026
bus icon
D50

Temporary Bus Stop Temporary Bus Stop Closure: 14th Street NW at Decatur Street on June 29

Show Details
06/29/2025 12/31/2025
bus icon
D44

Temporary Bus Stop Temporary Bus Stop Closure: Rock Creek Church Rd NW at Allison St on June 29

Show Details
06/29/2025 12/01/2025
bus icon
D74

Temporary Bus Stop Temporary Bus Stop Closure: Rock Creek Church Rd NW at Allison St on June 29

Show Details
06/29/2025 12/01/2025
bus icon
C37

Temporary Detour Temporary Detour: 41st St SE and Southern Ave on July 3rd

Show Details
07/03/2025 12/03/2025
bus icon
C81

Stop Relocation Temporary Bus Stop Relocation: Military Road NW at 14th St on July 11

Show Details
07/11/2025 01/11/2026
station icon
East Falls Church

Rail Station Construction,Parking Changes On July 21, 2025, Arlington County/Metro began reconstruction of the Bus Loop. The work will be divided into phases and will take approximately 15 months to complete. Parking facility capacity may be impacted during various phases of the work.

Show Details
07/21/2025 10/21/2026
bus icon
D40

Stop Relocation Permanent Bus Stop Relocation: Georgia Avenue NW and Kennedy Street

Show Details
07/28/2025 11/28/2025
bus icon
D4X

Stop Relocation Permanent Bus Stop Relocation: Georgia Avenue NW and Kennedy Street

Show Details
07/28/2025 11/28/2025
bus icon
D50

Temporary Bus Stop Temporary Bus Stop Closure: 14th Street NW and Jefferson Street

Show Details
07/28/2025 11/28/2025
bus icon
D5X

Temporary Bus Stop Temporary Bus Stop Closure: 14th Street NW and Jefferson Street

Show Details
07/28/2025 11/28/2025
bus icon
P31

Stop Relocation Permanent Bus Stop Relocation: Merrimac Drive

Show Details
07/27/2025 11/27/2025
station icon
Twinbrook

Parking Changes In July, Metro began rehabilitating surface parking lots and the East Bus Loop to enhance safety and improve the customer experience. During this work, customers should expect up to a 15% reduction in parking availability.

Show Details
07/27/2025 11/30/2025
bus icon
P24

Temporary Bus Stop Temporary Bus Stop Closure: Good Luck Road at Cipriano Road

Show Details
08/12/2025 12/12/2025
station icon
Bethesda

Rail Station Construction Metro is building a new mezzanine at the south end of the station, to connect Metro to the future Purple Line Bethesda Station. The mezzanine will not be available until Purple Line opens in 2027.

Show Details
07/28/2025 06/28/2027
bus icon
C53

Stop Discontinued Permanent Bus Stop Closure: 8th St SE and D St SE

Show Details
08/20/2025 12/31/2025
station icon
West Hyattsville

Escalator Closed On August 17, 2025, Metro began modernizing the escalators at the West Hyattsville Station. The work will take approximately five months to complete, and one escalator will be out of service at a time.

Show Details
08/17/2025 01/15/2026
bus icon
C85

Stop Discontinued Permanent Bus Stop Closure: Macarthur Blvd on August 22

Show Details
08/22/2025 12/22/2025
bus icon
D94

Stop Discontinued Permanent Bus Stop Closure: Macarthur Blvd on August 22

Show Details
08/22/2025 12/22/2025
bus icon
C15

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C37

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C41

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C51

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
P14

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P32

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P33

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P40

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P60

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P61

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P62

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P72

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
C11

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P93

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P94

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P97

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
C11

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P93

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P94

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P97

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
D74

Temporary Detour Temporary Detour: DDOT Construction Project on Connecticut Ave Underpass Lanes

Show Details
09/23/2025 09/23/2026
bus icon
D96

Temporary Detour Temporary Detour: DDOT Construction Project on Connecticut Ave Underpass Lanes

Show Details
09/23/2025 09/23/2026
bus icon
C63

Stop Change C63 Additional Stop Begins Sunday on September 15

Show Details
09/15/2025 02/04/2026
station icon
Glenmont

Elevator Closed On September 15, 2025, Metro began rehabilitating one of three elevators in the East Parking Garage. The work will take approximately nine months to complete, and one elevator will be out of service at a time, with the remaining two elevators operational.

Show Details
09/15/2025 06/01/2026
station icon
Navy Yard-Ballpark

Escalator Closed On September 28, 2025, Metro began a major capital project replacing the three entrance escalators and two platform escalators at the west entrance (at the corner of M and Half Streets, SE). The project is expected to be complete by Spring 2026.

Show Details
09/28/2025 03/30/2026
station icon
McPherson Square

Elevator Closed On October 7, 2025, Metro began rehabilitating the elevator servicing the Mezzanine and street-level at McPherson Square Station. The work will take approximately two months to complete, and the elevator will be out of service during that time.

Show Details
10/07/2025 12/16/2025
bus icon
P41

Stop Discontinued Permanent Bus Stop Closure: Landover Rd at Brightseat Rd on September 29

Show Details
09/29/2025 11/29/2025
bus icon
P14

Stop Relocation Temporary Bus Stop Relocation: Rivertech Ct at River Rd on October 3

Show Details
10/03/2025 01/31/2026
bus icon
P31

Stop Relocation Temporary Bus Stop Relocation: Rivertech Ct at River Rd on October 3

Show Details
10/03/2025 01/31/2026
bus icon
P40

Stop Relocation Permanent Bus Stop Relocation: Annapolis Rd at Gallatin St on October 10

Show Details
10/10/2025 10/09/2026
bus icon
C51

Stop Relocation Temporary Bus Stop Closure: 18th St NW at California St on October 10

Show Details
10/10/2025 01/10/2026
bus icon
C53

Stop Relocation Temporary Bus Stop Closure: 18th St NW at California St on October 10

Show Details
10/10/2025 01/10/2026
bus icon
M70

Stop Relocation Bus Stop Relocation: Fernwood Road and Thomas Spring Way on October 10

Show Details
10/11/2025 12/10/2025
bus icon
M42

Temporary Bus Stop Permanent Bus Stop Relocation: Cherry Hill Rd on October 17

Show Details
10/17/2025 02/05/2026
bus icon
M44

Temporary Bus Stop Permanent Bus Stop Relocation: Cherry Hill Rd on October 17

Show Details
10/17/2025 02/05/2026
station icon
West Falls Church

Other (chillers and lighting) On Nov. 17, 2025, Metro began construction at West Falls Church as part of a joint development project. As part of this work, the north parking lot has been closed; customers may utilize the onsite garage for parking throughout the project. The project will be divided into phases, with Phase 1 set to take place from Nov. 2025-June 2027.

Show Details
10/14/2025 08/01/2027
station icon
U Street/African-Amer Civil War Memorial/Cardozo

Escalator Closed On November 17, 2025, Metro will begin Phase 4 to install the canopy above the station escalators at U Street/African American Civil War Memorial/Cardozo Station.

Show Details
11/17/2025 09/30/2026
bus icon
C41

Temporary Bus Stop Temporary Bus Stop Closure: Construction on 14th St NE

Show Details
10/27/2025 04/22/2026
bus icon
A25

Stop Relocation Permanent Bus Bay Relocation: West Alexandria Transit Center on November 2

Show Details
11/02/2025 12/02/2025
bus icon
A28

Stop Relocation Permanent Bus Bay Relocation: West Alexandria Transit Center on November 2

Show Details
11/02/2025 12/02/2025
bus icon
F23

Stop Relocation Permanent Bus Bay Relocation: West Alexandria Transit Center on November 2

Show Details
11/02/2025 12/02/2025
bus icon
F24

Stop Relocation Permanent Bus Bay Relocation: West Alexandria Transit Center on November 2

Show Details
11/02/2025 12/02/2025
bus icon
C71

Temporary Bus Stop Temporary Bus Stop Closure: 18th St NE and Douglas St November 17

Show Details
11/17/2025 12/01/2025
bus icon
C53

Stop Change Reopened Bus Stop: Florida Ave and 4th St NW

Show Details
11/17/2025 02/17/2026
bus icon
C57

Stop Change Reopened Bus Stop: Florida Ave and 4th St NW

Show Details
11/17/2025 02/17/2026
bus icon
D72

Temporary Bus Stop Temporary Bus Stop Closure: Columbia Rd NW at California St on December 8

Show Details
12/08/2025 01/30/2026
bus icon
D74

Temporary Bus Stop Temporary Bus Stop Closure: Columbia Rd NW at California St on December 8

Show Details
12/08/2025 01/30/2026
station icon
New Carrollton

Elevator Closed On November 17, 2025, Metro began rehabilitating the elevator servicing the mezzanine and street-level at New Carrollton Station on the Ellin Road side. The work will take approximately two months to complete, and the elevator will be out of service during that time.

Show Details
11/17/2025 01/19/2026
bus icon
P14

Temporary Bus Stop Temporary Bus Stop Closure: River Rd at Haig Dr on December 4

Show Details
12/04/2025 01/01/2026
bus icon
P31

Temporary Bus Stop Temporary Bus Stop Closure: River Rd at Haig Dr on December 4

Show Details
12/04/2025 01/01/2026
bus icon
D32

Temporary Detour Temporary Detour: Brandy and Monica Concert on November 30

Show Details
11/30/2025 11/30/2025
bus icon
D40

Temporary Detour Temporary Detour: Brandy and Monica Concert on November 30

Show Details
11/30/2025 11/30/2025
bus icon
D10

Temporary Detour Temporary Detour: Americas Trot for Hunger 5K and Little Turkey 1 Miler on November 26

Show Details
11/26/2025 11/27/2025
bus icon
D1X

Temporary Detour Temporary Detour: Americas Trot for Hunger 5K and Little Turkey 1 Miler on November 26

Show Details
11/26/2025 11/27/2025
bus icon
D30

Temporary Detour Temporary Detour: Americas Trot for Hunger 5K and Little Turkey 1 Miler on November 26

Show Details
11/26/2025 11/27/2025
bus icon
D40

Temporary Detour Temporary Detour: Americas Trot for Hunger 5K and Little Turkey 1 Miler on November 26

Show Details
11/26/2025 11/27/2025
bus icon
D44

Temporary Detour Temporary Detour: Americas Trot for Hunger 5K and Little Turkey 1 Miler on November 26

Show Details
11/26/2025 11/27/2025
bus icon
D4X

Temporary Detour Temporary Detour: Americas Trot for Hunger 5K and Little Turkey 1 Miler on November 26

Show Details
11/26/2025 11/27/2025
bus icon
D50

Temporary Detour Temporary Detour: Americas Trot for Hunger 5K and Little Turkey 1 Miler on November 26

Show Details
11/26/2025 11/27/2025
bus icon
D60

Temporary Detour Temporary Detour: Americas Trot for Hunger 5K and Little Turkey 1 Miler on November 26

Show Details
11/26/2025 11/27/2025
bus icon
D6X

Temporary Detour Temporary Detour: Americas Trot for Hunger 5K and Little Turkey 1 Miler on November 26

Show Details
11/26/2025 11/27/2025
bus icon
F62

Temporary Detour Temporary Detour: 2025 Arlington Turkey Trot on November 27

Show Details
11/27/2025 11/27/2025
bus icon
A11

Temporary Detour Temporary Detour: Alexandria Turkey Trot Del Ray 2025 on November 27

Show Details
11/27/2025 11/27/2025
bus icon
A12

Temporary Detour Temporary Detour: Alexandria Turkey Trot Del Ray 2025 on November 27

Show Details
11/27/2025 11/27/2025
bus icon
F23

Temporary Detour Temporary Detour: City of Fairfax Turkey Trot 5K on November 27

Show Details
11/27/2025 11/27/2025
bus icon
D10

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D20

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D50

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D5X

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D72

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D80

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D94

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D96

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
F19

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D96

Temporary Detour Temporary Detour: 43rd Annual Turkey Chase Charity Race on November 27

Show Details
11/27/2025 11/27/2025
bus icon
M22

Temporary Detour Temporary Detour: 43rd Annual Turkey Chase Charity Race on November 27

Show Details
11/27/2025 11/27/2025
bus icon
M70

Temporary Detour Temporary Detour: 43rd Annual Turkey Chase Charity Race on November 27

Show Details
11/27/2025 11/27/2025
bus icon
P10

Stop Relocation Permanent Bus Stop Closure: Rhode Island Ave NE at Eastern Ave on November 26

Show Details
11/26/2025 12/26/2025
bus icon
P1X

Stop Relocation Permanent Bus Stop Closure: Rhode Island Ave NE at Eastern Ave on November 26

Show Details
11/26/2025 12/26/2025
bus icon
P40

Stop Relocation Permanent Bus Stop Closure: Rhode Island Ave NE at Eastern Ave on November 26

Show Details
11/26/2025 12/26/2025
bus icon
D30

Temporary Bus Stop Temporary Bus Stop Closure: S Dakota Ave NE at Delafield St on December 5

Show Details
11/05/2025 12/08/2025
station icon
East Falls Church

Other (chillers and lighting) East Falls Church and Vienna: Bicycle Rack Removal on December 3, 2025

Show Details
11/26/2025 12/05/2025
station icon
Vienna/Fairfax-GMU

Other (chillers and lighting) East Falls Church and Vienna: Bicycle Rack Removal on December 3, 2025

Show Details
11/26/2025 12/05/2025
bus icon
P41

Temporary Detour Temporary Detour: Washington Commanders vs Denver Broncos on November 30

Show Details
11/30/2025 11/30/2025
bus icon
P61

Temporary Detour Temporary Detour: Washington Commanders vs Denver Broncos on November 30

Show Details
11/30/2025 11/30/2025
Route/Line What's Happening Issue Start Date End Date
station icon
L'Enfant Plaza

Escalator Closed In May 2024, Metro continued a major capital project replacing entrance escalators: three at Entrance B (6th St) from late May 2024 to June 2025 and three at Entrance C (9th St) from June 2025 to August 2026.

Show Details
05/17/2024 08/31/2026
station icon
Silver Spring

Rail Station Construction MDOT MTA Purple Line construction crews continue to work on a new mezzanine that will connect the future station to Metro, MARC, and the transit center. Expect construction through 2026.

Show Details
04/13/2023 12/31/2026
station icon
Judiciary Square

Entrance/Exit Inhibited In January 2023, Metro began a capital project to install a new staircase and canopy at Judiciary Square’s north entrance. The stairway is scheduled to open in spring 2026 and canopy construction will begin spring 2026.

Show Details
01/01/2023 12/31/2026
station icon
Arlington Cemetery

Rail Station Construction In June 2023, Metro began a major capital project to install two canopies above the station escalators.

Show Details
06/01/2023 03/31/2026
station icon
Fort Totten

Parking Changes 50% of the Kiss & Ride Lot at Fort Totten Station closed for repairs. During this time, daily parking is available in the Park & Ride (rates apply).

Show Details
09/01/2024 12/31/2025
station icon
Rosslyn

Escalator Closed In January 2024, Metro began a major capital project replacing the four entrance escalators and four platform escalators at Rosslyn Station –all eight escalators are expected to be completed by May 2026.

Show Details
01/02/2024 06/30/2026
station icon
Southern Avenue

Parking Changes In June 2024, Metro began reconfiguring the Kiss & Ride Lot and reopened the lower level of the Park & Ride Lot. Up to 85% of parking spaces in the Kiss & Ride Lot will close indefinitely; but daily parking is available in the Park & Ride (rates apply).

Show Details
06/24/2024 12/31/2026
bus icon
D50

Temporary Bus Stop Temporary Bus Stop Closure: 14th Street NW at Decatur Street on June 29

Show Details
06/29/2025 12/31/2025
bus icon
D44

Temporary Bus Stop Temporary Bus Stop Closure: Rock Creek Church Rd NW at Allison St on June 29

Show Details
06/29/2025 12/01/2025
bus icon
D74

Temporary Bus Stop Temporary Bus Stop Closure: Rock Creek Church Rd NW at Allison St on June 29

Show Details
06/29/2025 12/01/2025
bus icon
C37

Temporary Detour Temporary Detour: 41st St SE and Southern Ave on July 3rd

Show Details
07/03/2025 12/03/2025
bus icon
C81

Stop Relocation Temporary Bus Stop Relocation: Military Road NW at 14th St on July 11

Show Details
07/11/2025 01/11/2026
station icon
East Falls Church

Rail Station Construction,Parking Changes On July 21, 2025, Arlington County/Metro began reconstruction of the Bus Loop. The work will be divided into phases and will take approximately 15 months to complete. Parking facility capacity may be impacted during various phases of the work.

Show Details
07/21/2025 10/21/2026
station icon
Twinbrook

Parking Changes In July, Metro began rehabilitating surface parking lots and the East Bus Loop to enhance safety and improve the customer experience. During this work, customers should expect up to a 15% reduction in parking availability.

Show Details
07/27/2025 11/30/2025
bus icon
P24

Temporary Bus Stop Temporary Bus Stop Closure: Good Luck Road at Cipriano Road

Show Details
08/12/2025 12/12/2025
station icon
Bethesda

Rail Station Construction Metro is building a new mezzanine at the south end of the station, to connect Metro to the future Purple Line Bethesda Station. The mezzanine will not be available until Purple Line opens in 2027.

Show Details
07/28/2025 06/28/2027
bus icon
C53

Stop Discontinued Permanent Bus Stop Closure: 8th St SE and D St SE

Show Details
08/20/2025 12/31/2025
station icon
West Hyattsville

Escalator Closed On August 17, 2025, Metro began modernizing the escalators at the West Hyattsville Station. The work will take approximately five months to complete, and one escalator will be out of service at a time.

Show Details
08/17/2025 01/15/2026
bus icon
C85

Stop Discontinued Permanent Bus Stop Closure: Macarthur Blvd on August 22

Show Details
08/22/2025 12/22/2025
bus icon
D94

Stop Discontinued Permanent Bus Stop Closure: Macarthur Blvd on August 22

Show Details
08/22/2025 12/22/2025
bus icon
C15

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C37

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C41

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C51

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
P14

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P32

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P33

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P40

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P60

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P61

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P62

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P72

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
C11

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P93

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P94

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P97

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
C11

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P93

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P94

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P97

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
D74

Temporary Detour Temporary Detour: DDOT Construction Project on Connecticut Ave Underpass Lanes

Show Details
09/23/2025 09/23/2026
bus icon
D96

Temporary Detour Temporary Detour: DDOT Construction Project on Connecticut Ave Underpass Lanes

Show Details
09/23/2025 09/23/2026
bus icon
C63

Stop Change C63 Additional Stop Begins Sunday on September 15

Show Details
09/15/2025 02/04/2026
station icon
Glenmont

Elevator Closed On September 15, 2025, Metro began rehabilitating one of three elevators in the East Parking Garage. The work will take approximately nine months to complete, and one elevator will be out of service at a time, with the remaining two elevators operational.

Show Details
09/15/2025 06/01/2026
station icon
Navy Yard-Ballpark

Escalator Closed On September 28, 2025, Metro began a major capital project replacing the three entrance escalators and two platform escalators at the west entrance (at the corner of M and Half Streets, SE). The project is expected to be complete by Spring 2026.

Show Details
09/28/2025 03/30/2026
station icon
McPherson Square

Elevator Closed On October 7, 2025, Metro began rehabilitating the elevator servicing the Mezzanine and street-level at McPherson Square Station. The work will take approximately two months to complete, and the elevator will be out of service during that time.

Show Details
10/07/2025 12/16/2025
bus icon
P41

Stop Discontinued Permanent Bus Stop Closure: Landover Rd at Brightseat Rd on September 29

Show Details
09/29/2025 11/29/2025
bus icon
P14

Stop Relocation Temporary Bus Stop Relocation: Rivertech Ct at River Rd on October 3

Show Details
10/03/2025 01/31/2026
bus icon
P31

Stop Relocation Temporary Bus Stop Relocation: Rivertech Ct at River Rd on October 3

Show Details
10/03/2025 01/31/2026
bus icon
P40

Stop Relocation Permanent Bus Stop Relocation: Annapolis Rd at Gallatin St on October 10

Show Details
10/10/2025 10/09/2026
bus icon
C51

Stop Relocation Temporary Bus Stop Closure: 18th St NW at California St on October 10

Show Details
10/10/2025 01/10/2026
bus icon
C53

Stop Relocation Temporary Bus Stop Closure: 18th St NW at California St on October 10

Show Details
10/10/2025 01/10/2026
bus icon
M70

Stop Relocation Bus Stop Relocation: Fernwood Road and Thomas Spring Way on October 10

Show Details
10/11/2025 12/10/2025
bus icon
M42

Temporary Bus Stop Permanent Bus Stop Relocation: Cherry Hill Rd on October 17

Show Details
10/17/2025 02/05/2026
bus icon
M44

Temporary Bus Stop Permanent Bus Stop Relocation: Cherry Hill Rd on October 17

Show Details
10/17/2025 02/05/2026
station icon
West Falls Church

Other (chillers and lighting) On Nov. 17, 2025, Metro began construction at West Falls Church as part of a joint development project. As part of this work, the north parking lot has been closed; customers may utilize the onsite garage for parking throughout the project. The project will be divided into phases, with Phase 1 set to take place from Nov. 2025-June 2027.

Show Details
10/14/2025 08/01/2027
station icon
U Street/African-Amer Civil War Memorial/Cardozo

Escalator Closed On November 17, 2025, Metro will begin Phase 4 to install the canopy above the station escalators at U Street/African American Civil War Memorial/Cardozo Station.

Show Details
11/17/2025 09/30/2026
bus icon
C41

Temporary Bus Stop Temporary Bus Stop Closure: Construction on 14th St NE

Show Details
10/27/2025 04/22/2026
bus icon
A25

Stop Relocation Permanent Bus Bay Relocation: West Alexandria Transit Center on November 2

Show Details
11/02/2025 12/02/2025
bus icon
A28

Stop Relocation Permanent Bus Bay Relocation: West Alexandria Transit Center on November 2

Show Details
11/02/2025 12/02/2025
bus icon
F23

Stop Relocation Permanent Bus Bay Relocation: West Alexandria Transit Center on November 2

Show Details
11/02/2025 12/02/2025
bus icon
F24

Stop Relocation Permanent Bus Bay Relocation: West Alexandria Transit Center on November 2

Show Details
11/02/2025 12/02/2025
bus icon
C71

Temporary Bus Stop Temporary Bus Stop Closure: 18th St NE and Douglas St November 17

Show Details
11/17/2025 12/01/2025
bus icon
C53

Stop Change Reopened Bus Stop: Florida Ave and 4th St NW

Show Details
11/17/2025 02/17/2026
bus icon
C57

Stop Change Reopened Bus Stop: Florida Ave and 4th St NW

Show Details
11/17/2025 02/17/2026
bus icon
D72

Temporary Bus Stop Temporary Bus Stop Closure: Columbia Rd NW at California St on December 8

Show Details
12/08/2025 01/30/2026
bus icon
D74

Temporary Bus Stop Temporary Bus Stop Closure: Columbia Rd NW at California St on December 8

Show Details
12/08/2025 01/30/2026
station icon
New Carrollton

Elevator Closed On November 17, 2025, Metro began rehabilitating the elevator servicing the mezzanine and street-level at New Carrollton Station on the Ellin Road side. The work will take approximately two months to complete, and the elevator will be out of service during that time.

Show Details
11/17/2025 01/19/2026
bus icon
P14

Temporary Bus Stop Temporary Bus Stop Closure: River Rd at Haig Dr on December 4

Show Details
12/04/2025 01/01/2026
bus icon
P31

Temporary Bus Stop Temporary Bus Stop Closure: River Rd at Haig Dr on December 4

Show Details
12/04/2025 01/01/2026
bus icon
D32

Temporary Detour Temporary Detour: Brandy and Monica Concert on November 30

Show Details
11/30/2025 11/30/2025
bus icon
D40

Temporary Detour Temporary Detour: Brandy and Monica Concert on November 30

Show Details
11/30/2025 11/30/2025
bus icon
D10

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D20

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D50

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D5X

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D72

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D80

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D94

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D96

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
F19

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
P10

Stop Relocation Permanent Bus Stop Closure: Rhode Island Ave NE at Eastern Ave on November 26

Show Details
11/26/2025 12/26/2025
bus icon
P1X

Stop Relocation Permanent Bus Stop Closure: Rhode Island Ave NE at Eastern Ave on November 26

Show Details
11/26/2025 12/26/2025
bus icon
P40

Stop Relocation Permanent Bus Stop Closure: Rhode Island Ave NE at Eastern Ave on November 26

Show Details
11/26/2025 12/26/2025
bus icon
D30

Temporary Bus Stop Temporary Bus Stop Closure: S Dakota Ave NE at Delafield St on December 5

Show Details
11/05/2025 12/08/2025
station icon
East Falls Church

Other (chillers and lighting) East Falls Church and Vienna: Bicycle Rack Removal on December 3, 2025

Show Details
11/26/2025 12/05/2025
station icon
Vienna/Fairfax-GMU

Other (chillers and lighting) East Falls Church and Vienna: Bicycle Rack Removal on December 3, 2025

Show Details
11/26/2025 12/05/2025
bus icon
P41

Temporary Detour Temporary Detour: Washington Commanders vs Denver Broncos on November 30

Show Details
11/30/2025 11/30/2025
bus icon
P61

Temporary Detour Temporary Detour: Washington Commanders vs Denver Broncos on November 30

Show Details
11/30/2025 11/30/2025
Route/Line What's Happening Issue Start Date End Date
station icon
L'Enfant Plaza

Escalator Closed In May 2024, Metro continued a major capital project replacing entrance escalators: three at Entrance B (6th St) from late May 2024 to June 2025 and three at Entrance C (9th St) from June 2025 to August 2026.

Show Details
05/17/2024 08/31/2026
station icon
Silver Spring

Rail Station Construction MDOT MTA Purple Line construction crews continue to work on a new mezzanine that will connect the future station to Metro, MARC, and the transit center. Expect construction through 2026.

Show Details
04/13/2023 12/31/2026
station icon
Judiciary Square

Entrance/Exit Inhibited In January 2023, Metro began a capital project to install a new staircase and canopy at Judiciary Square’s north entrance. The stairway is scheduled to open in spring 2026 and canopy construction will begin spring 2026.

Show Details
01/01/2023 12/31/2026
station icon
Arlington Cemetery

Rail Station Construction In June 2023, Metro began a major capital project to install two canopies above the station escalators.

Show Details
06/01/2023 03/31/2026
station icon
Fort Totten

Parking Changes 50% of the Kiss & Ride Lot at Fort Totten Station closed for repairs. During this time, daily parking is available in the Park & Ride (rates apply).

Show Details
09/01/2024 12/31/2025
station icon
Rosslyn

Escalator Closed In January 2024, Metro began a major capital project replacing the four entrance escalators and four platform escalators at Rosslyn Station –all eight escalators are expected to be completed by May 2026.

Show Details
01/02/2024 06/30/2026
station icon
Southern Avenue

Parking Changes In June 2024, Metro began reconfiguring the Kiss & Ride Lot and reopened the lower level of the Park & Ride Lot. Up to 85% of parking spaces in the Kiss & Ride Lot will close indefinitely; but daily parking is available in the Park & Ride (rates apply).

Show Details
06/24/2024 12/31/2026
bus icon
D50

Temporary Bus Stop Temporary Bus Stop Closure: 14th Street NW at Decatur Street on June 29

Show Details
06/29/2025 12/31/2025
bus icon
D44

Temporary Bus Stop Temporary Bus Stop Closure: Rock Creek Church Rd NW at Allison St on June 29

Show Details
06/29/2025 12/01/2025
bus icon
D74

Temporary Bus Stop Temporary Bus Stop Closure: Rock Creek Church Rd NW at Allison St on June 29

Show Details
06/29/2025 12/01/2025
bus icon
C37

Temporary Detour Temporary Detour: 41st St SE and Southern Ave on July 3rd

Show Details
07/03/2025 12/03/2025
bus icon
C81

Stop Relocation Temporary Bus Stop Relocation: Military Road NW at 14th St on July 11

Show Details
07/11/2025 01/11/2026
station icon
East Falls Church

Rail Station Construction,Parking Changes On July 21, 2025, Arlington County/Metro began reconstruction of the Bus Loop. The work will be divided into phases and will take approximately 15 months to complete. Parking facility capacity may be impacted during various phases of the work.

Show Details
07/21/2025 10/21/2026
bus icon
P24

Temporary Bus Stop Temporary Bus Stop Closure: Good Luck Road at Cipriano Road

Show Details
08/12/2025 12/12/2025
station icon
Bethesda

Rail Station Construction Metro is building a new mezzanine at the south end of the station, to connect Metro to the future Purple Line Bethesda Station. The mezzanine will not be available until Purple Line opens in 2027.

Show Details
07/28/2025 06/28/2027
bus icon
C53

Stop Discontinued Permanent Bus Stop Closure: 8th St SE and D St SE

Show Details
08/20/2025 12/31/2025
station icon
West Hyattsville

Escalator Closed On August 17, 2025, Metro began modernizing the escalators at the West Hyattsville Station. The work will take approximately five months to complete, and one escalator will be out of service at a time.

Show Details
08/17/2025 01/15/2026
bus icon
C85

Stop Discontinued Permanent Bus Stop Closure: Macarthur Blvd on August 22

Show Details
08/22/2025 12/22/2025
bus icon
D94

Stop Discontinued Permanent Bus Stop Closure: Macarthur Blvd on August 22

Show Details
08/22/2025 12/22/2025
bus icon
C15

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C37

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C41

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C51

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
P14

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P32

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P33

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P40

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P60

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P61

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P62

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P72

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
C11

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P93

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P94

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P97

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
C11

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P93

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P94

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P97

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
D74

Temporary Detour Temporary Detour: DDOT Construction Project on Connecticut Ave Underpass Lanes

Show Details
09/23/2025 09/23/2026
bus icon
D96

Temporary Detour Temporary Detour: DDOT Construction Project on Connecticut Ave Underpass Lanes

Show Details
09/23/2025 09/23/2026
bus icon
C63

Stop Change C63 Additional Stop Begins Sunday on September 15

Show Details
09/15/2025 02/04/2026
station icon
Glenmont

Elevator Closed On September 15, 2025, Metro began rehabilitating one of three elevators in the East Parking Garage. The work will take approximately nine months to complete, and one elevator will be out of service at a time, with the remaining two elevators operational.

Show Details
09/15/2025 06/01/2026
station icon
Navy Yard-Ballpark

Escalator Closed On September 28, 2025, Metro began a major capital project replacing the three entrance escalators and two platform escalators at the west entrance (at the corner of M and Half Streets, SE). The project is expected to be complete by Spring 2026.

Show Details
09/28/2025 03/30/2026
station icon
McPherson Square

Elevator Closed On October 7, 2025, Metro began rehabilitating the elevator servicing the Mezzanine and street-level at McPherson Square Station. The work will take approximately two months to complete, and the elevator will be out of service during that time.

Show Details
10/07/2025 12/16/2025
bus icon
P14

Stop Relocation Temporary Bus Stop Relocation: Rivertech Ct at River Rd on October 3

Show Details
10/03/2025 01/31/2026
bus icon
P31

Stop Relocation Temporary Bus Stop Relocation: Rivertech Ct at River Rd on October 3

Show Details
10/03/2025 01/31/2026
bus icon
P40

Stop Relocation Permanent Bus Stop Relocation: Annapolis Rd at Gallatin St on October 10

Show Details
10/10/2025 10/09/2026
bus icon
C51

Stop Relocation Temporary Bus Stop Closure: 18th St NW at California St on October 10

Show Details
10/10/2025 01/10/2026
bus icon
C53

Stop Relocation Temporary Bus Stop Closure: 18th St NW at California St on October 10

Show Details
10/10/2025 01/10/2026
bus icon
M70

Stop Relocation Bus Stop Relocation: Fernwood Road and Thomas Spring Way on October 10

Show Details
10/11/2025 12/10/2025
bus icon
M42

Temporary Bus Stop Permanent Bus Stop Relocation: Cherry Hill Rd on October 17

Show Details
10/17/2025 02/05/2026
bus icon
M44

Temporary Bus Stop Permanent Bus Stop Relocation: Cherry Hill Rd on October 17

Show Details
10/17/2025 02/05/2026
station icon
West Falls Church

Other (chillers and lighting) On Nov. 17, 2025, Metro began construction at West Falls Church as part of a joint development project. As part of this work, the north parking lot has been closed; customers may utilize the onsite garage for parking throughout the project. The project will be divided into phases, with Phase 1 set to take place from Nov. 2025-June 2027.

Show Details
10/14/2025 08/01/2027
station icon
U Street/African-Amer Civil War Memorial/Cardozo

Escalator Closed On November 17, 2025, Metro will begin Phase 4 to install the canopy above the station escalators at U Street/African American Civil War Memorial/Cardozo Station.

Show Details
11/17/2025 09/30/2026
bus icon
C41

Temporary Bus Stop Temporary Bus Stop Closure: Construction on 14th St NE

Show Details
10/27/2025 04/22/2026
bus icon
A25

Stop Relocation Permanent Bus Bay Relocation: West Alexandria Transit Center on November 2

Show Details
11/02/2025 12/02/2025
bus icon
A28

Stop Relocation Permanent Bus Bay Relocation: West Alexandria Transit Center on November 2

Show Details
11/02/2025 12/02/2025
bus icon
F23

Stop Relocation Permanent Bus Bay Relocation: West Alexandria Transit Center on November 2

Show Details
11/02/2025 12/02/2025
bus icon
F24

Stop Relocation Permanent Bus Bay Relocation: West Alexandria Transit Center on November 2

Show Details
11/02/2025 12/02/2025
bus icon
C71

Temporary Bus Stop Temporary Bus Stop Closure: 18th St NE and Douglas St November 17

Show Details
11/17/2025 12/01/2025
bus icon
C53

Stop Change Reopened Bus Stop: Florida Ave and 4th St NW

Show Details
11/17/2025 02/17/2026
bus icon
C57

Stop Change Reopened Bus Stop: Florida Ave and 4th St NW

Show Details
11/17/2025 02/17/2026
bus icon
D72

Temporary Bus Stop Temporary Bus Stop Closure: Columbia Rd NW at California St on December 8

Show Details
12/08/2025 01/30/2026
bus icon
D74

Temporary Bus Stop Temporary Bus Stop Closure: Columbia Rd NW at California St on December 8

Show Details
12/08/2025 01/30/2026
station icon
New Carrollton

Elevator Closed On November 17, 2025, Metro began rehabilitating the elevator servicing the mezzanine and street-level at New Carrollton Station on the Ellin Road side. The work will take approximately two months to complete, and the elevator will be out of service during that time.

Show Details
11/17/2025 01/19/2026
bus icon
P14

Temporary Bus Stop Temporary Bus Stop Closure: River Rd at Haig Dr on December 4

Show Details
12/04/2025 01/01/2026
bus icon
P31

Temporary Bus Stop Temporary Bus Stop Closure: River Rd at Haig Dr on December 4

Show Details
12/04/2025 01/01/2026
bus icon
D10

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D20

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D50

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D5X

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D72

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D80

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D94

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D96

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
F19

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
P10

Stop Relocation Permanent Bus Stop Closure: Rhode Island Ave NE at Eastern Ave on November 26

Show Details
11/26/2025 12/26/2025
bus icon
P1X

Stop Relocation Permanent Bus Stop Closure: Rhode Island Ave NE at Eastern Ave on November 26

Show Details
11/26/2025 12/26/2025
bus icon
P40

Stop Relocation Permanent Bus Stop Closure: Rhode Island Ave NE at Eastern Ave on November 26

Show Details
11/26/2025 12/26/2025
bus icon
D30

Temporary Bus Stop Temporary Bus Stop Closure: S Dakota Ave NE at Delafield St on December 5

Show Details
11/05/2025 12/08/2025
station icon
East Falls Church

Other (chillers and lighting) East Falls Church and Vienna: Bicycle Rack Removal on December 3, 2025

Show Details
11/26/2025 12/05/2025
station icon
Vienna/Fairfax-GMU

Other (chillers and lighting) East Falls Church and Vienna: Bicycle Rack Removal on December 3, 2025

Show Details
11/26/2025 12/05/2025
Route/Line What's Happening Issue Start Date End Date
station icon
L'Enfant Plaza

Escalator Closed In May 2024, Metro continued a major capital project replacing entrance escalators: three at Entrance B (6th St) from late May 2024 to June 2025 and three at Entrance C (9th St) from June 2025 to August 2026.

Show Details
05/17/2024 08/31/2026
station icon
Silver Spring

Rail Station Construction MDOT MTA Purple Line construction crews continue to work on a new mezzanine that will connect the future station to Metro, MARC, and the transit center. Expect construction through 2026.

Show Details
04/13/2023 12/31/2026
station icon
Judiciary Square

Entrance/Exit Inhibited In January 2023, Metro began a capital project to install a new staircase and canopy at Judiciary Square’s north entrance. The stairway is scheduled to open in spring 2026 and canopy construction will begin spring 2026.

Show Details
01/01/2023 12/31/2026
station icon
Arlington Cemetery

Rail Station Construction In June 2023, Metro began a major capital project to install two canopies above the station escalators.

Show Details
06/01/2023 03/31/2026
station icon
Fort Totten

Parking Changes 50% of the Kiss & Ride Lot at Fort Totten Station closed for repairs. During this time, daily parking is available in the Park & Ride (rates apply).

Show Details
09/01/2024 12/31/2025
station icon
Rosslyn

Escalator Closed In January 2024, Metro began a major capital project replacing the four entrance escalators and four platform escalators at Rosslyn Station –all eight escalators are expected to be completed by May 2026.

Show Details
01/02/2024 06/30/2026
station icon
Southern Avenue

Parking Changes In June 2024, Metro began reconfiguring the Kiss & Ride Lot and reopened the lower level of the Park & Ride Lot. Up to 85% of parking spaces in the Kiss & Ride Lot will close indefinitely; but daily parking is available in the Park & Ride (rates apply).

Show Details
06/24/2024 12/31/2026
bus icon
D50

Temporary Bus Stop Temporary Bus Stop Closure: 14th Street NW at Decatur Street on June 29

Show Details
06/29/2025 12/31/2025
bus icon
D44

Temporary Bus Stop Temporary Bus Stop Closure: Rock Creek Church Rd NW at Allison St on June 29

Show Details
06/29/2025 12/01/2025
bus icon
D74

Temporary Bus Stop Temporary Bus Stop Closure: Rock Creek Church Rd NW at Allison St on June 29

Show Details
06/29/2025 12/01/2025
bus icon
C37

Temporary Detour Temporary Detour: 41st St SE and Southern Ave on July 3rd

Show Details
07/03/2025 12/03/2025
bus icon
C81

Stop Relocation Temporary Bus Stop Relocation: Military Road NW at 14th St on July 11

Show Details
07/11/2025 01/11/2026
station icon
East Falls Church

Rail Station Construction,Parking Changes On July 21, 2025, Arlington County/Metro began reconstruction of the Bus Loop. The work will be divided into phases and will take approximately 15 months to complete. Parking facility capacity may be impacted during various phases of the work.

Show Details
07/21/2025 10/21/2026
bus icon
D40

Stop Relocation Permanent Bus Stop Relocation: Georgia Avenue NW and Kennedy Street

Show Details
07/28/2025 11/28/2025
bus icon
D4X

Stop Relocation Permanent Bus Stop Relocation: Georgia Avenue NW and Kennedy Street

Show Details
07/28/2025 11/28/2025
bus icon
D50

Temporary Bus Stop Temporary Bus Stop Closure: 14th Street NW and Jefferson Street

Show Details
07/28/2025 11/28/2025
bus icon
D5X

Temporary Bus Stop Temporary Bus Stop Closure: 14th Street NW and Jefferson Street

Show Details
07/28/2025 11/28/2025
bus icon
P31

Stop Relocation Permanent Bus Stop Relocation: Merrimac Drive

Show Details
07/27/2025 11/27/2025
station icon
Twinbrook

Parking Changes In July, Metro began rehabilitating surface parking lots and the East Bus Loop to enhance safety and improve the customer experience. During this work, customers should expect up to a 15% reduction in parking availability.

Show Details
07/27/2025 11/30/2025
bus icon
P24

Temporary Bus Stop Temporary Bus Stop Closure: Good Luck Road at Cipriano Road

Show Details
08/12/2025 12/12/2025
station icon
Bethesda

Rail Station Construction Metro is building a new mezzanine at the south end of the station, to connect Metro to the future Purple Line Bethesda Station. The mezzanine will not be available until Purple Line opens in 2027.

Show Details
07/28/2025 06/28/2027
bus icon
C53

Stop Discontinued Permanent Bus Stop Closure: 8th St SE and D St SE

Show Details
08/20/2025 12/31/2025
station icon
West Hyattsville

Escalator Closed On August 17, 2025, Metro began modernizing the escalators at the West Hyattsville Station. The work will take approximately five months to complete, and one escalator will be out of service at a time.

Show Details
08/17/2025 01/15/2026
bus icon
C85

Stop Discontinued Permanent Bus Stop Closure: Macarthur Blvd on August 22

Show Details
08/22/2025 12/22/2025
bus icon
D94

Stop Discontinued Permanent Bus Stop Closure: Macarthur Blvd on August 22

Show Details
08/22/2025 12/22/2025
bus icon
C15

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C37

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C41

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C51

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
P14

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P32

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P33

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P40

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P60

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P61

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P62

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
P72

Service Change Metrobus Service Improvements Begin Sunday on September 14 2025

Show Details
09/14/2025 12/31/2025
bus icon
C11

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P93

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P94

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P97

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
C11

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P93

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P94

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P97

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
D74

Temporary Detour Temporary Detour: DDOT Construction Project on Connecticut Ave Underpass Lanes

Show Details
09/23/2025 09/23/2026
bus icon
D96

Temporary Detour Temporary Detour: DDOT Construction Project on Connecticut Ave Underpass Lanes

Show Details
09/23/2025 09/23/2026
bus icon
C63

Stop Change C63 Additional Stop Begins Sunday on September 15

Show Details
09/15/2025 02/04/2026
station icon
Glenmont

Elevator Closed On September 15, 2025, Metro began rehabilitating one of three elevators in the East Parking Garage. The work will take approximately nine months to complete, and one elevator will be out of service at a time, with the remaining two elevators operational.

Show Details
09/15/2025 06/01/2026
station icon
Navy Yard-Ballpark

Escalator Closed On September 28, 2025, Metro began a major capital project replacing the three entrance escalators and two platform escalators at the west entrance (at the corner of M and Half Streets, SE). The project is expected to be complete by Spring 2026.

Show Details
09/28/2025 03/30/2026
station icon
McPherson Square

Elevator Closed On October 7, 2025, Metro began rehabilitating the elevator servicing the Mezzanine and street-level at McPherson Square Station. The work will take approximately two months to complete, and the elevator will be out of service during that time.

Show Details
10/07/2025 12/16/2025
bus icon
P41

Stop Discontinued Permanent Bus Stop Closure: Landover Rd at Brightseat Rd on September 29

Show Details
09/29/2025 11/29/2025
bus icon
P14

Stop Relocation Temporary Bus Stop Relocation: Rivertech Ct at River Rd on October 3

Show Details
10/03/2025 01/31/2026
bus icon
P31

Stop Relocation Temporary Bus Stop Relocation: Rivertech Ct at River Rd on October 3

Show Details
10/03/2025 01/31/2026
bus icon
P40

Stop Relocation Permanent Bus Stop Relocation: Annapolis Rd at Gallatin St on October 10

Show Details
10/10/2025 10/09/2026
bus icon
C51

Stop Relocation Temporary Bus Stop Closure: 18th St NW at California St on October 10

Show Details
10/10/2025 01/10/2026
bus icon
C53

Stop Relocation Temporary Bus Stop Closure: 18th St NW at California St on October 10

Show Details
10/10/2025 01/10/2026
bus icon
M70

Stop Relocation Bus Stop Relocation: Fernwood Road and Thomas Spring Way on October 10

Show Details
10/11/2025 12/10/2025
bus icon
M42

Temporary Bus Stop Permanent Bus Stop Relocation: Cherry Hill Rd on October 17

Show Details
10/17/2025 02/05/2026
bus icon
M44

Temporary Bus Stop Permanent Bus Stop Relocation: Cherry Hill Rd on October 17

Show Details
10/17/2025 02/05/2026
station icon
West Falls Church

Other (chillers and lighting) On Nov. 17, 2025, Metro began construction at West Falls Church as part of a joint development project. As part of this work, the north parking lot has been closed; customers may utilize the onsite garage for parking throughout the project. The project will be divided into phases, with Phase 1 set to take place from Nov. 2025-June 2027.

Show Details
10/14/2025 08/01/2027
station icon
U Street/African-Amer Civil War Memorial/Cardozo

Escalator Closed On November 17, 2025, Metro will begin Phase 4 to install the canopy above the station escalators at U Street/African American Civil War Memorial/Cardozo Station.

Show Details
11/17/2025 09/30/2026
bus icon
C41

Temporary Bus Stop Temporary Bus Stop Closure: Construction on 14th St NE

Show Details
10/27/2025 04/22/2026
bus icon
A25

Stop Relocation Permanent Bus Bay Relocation: West Alexandria Transit Center on November 2

Show Details
11/02/2025 12/02/2025
bus icon
A28

Stop Relocation Permanent Bus Bay Relocation: West Alexandria Transit Center on November 2

Show Details
11/02/2025 12/02/2025
bus icon
F23

Stop Relocation Permanent Bus Bay Relocation: West Alexandria Transit Center on November 2

Show Details
11/02/2025 12/02/2025
bus icon
F24

Stop Relocation Permanent Bus Bay Relocation: West Alexandria Transit Center on November 2

Show Details
11/02/2025 12/02/2025
bus icon
C71

Temporary Bus Stop Temporary Bus Stop Closure: 18th St NE and Douglas St November 17

Show Details
11/17/2025 12/01/2025
bus icon
C53

Stop Change Reopened Bus Stop: Florida Ave and 4th St NW

Show Details
11/17/2025 02/17/2026
bus icon
C57

Stop Change Reopened Bus Stop: Florida Ave and 4th St NW

Show Details
11/17/2025 02/17/2026
bus icon
D72

Temporary Bus Stop Temporary Bus Stop Closure: Columbia Rd NW at California St on December 8

Show Details
12/08/2025 01/30/2026
bus icon
D74

Temporary Bus Stop Temporary Bus Stop Closure: Columbia Rd NW at California St on December 8

Show Details
12/08/2025 01/30/2026
station icon
New Carrollton

Elevator Closed On November 17, 2025, Metro began rehabilitating the elevator servicing the mezzanine and street-level at New Carrollton Station on the Ellin Road side. The work will take approximately two months to complete, and the elevator will be out of service during that time.

Show Details
11/17/2025 01/19/2026
bus icon
P14

Temporary Bus Stop Temporary Bus Stop Closure: River Rd at Haig Dr on December 4

Show Details
12/04/2025 01/01/2026
bus icon
P31

Temporary Bus Stop Temporary Bus Stop Closure: River Rd at Haig Dr on December 4

Show Details
12/04/2025 01/01/2026
bus icon
D32

Temporary Detour Temporary Detour: Brandy and Monica Concert on November 30

Show Details
11/30/2025 11/30/2025
bus icon
D40

Temporary Detour Temporary Detour: Brandy and Monica Concert on November 30

Show Details
11/30/2025 11/30/2025
bus icon
D10

Temporary Detour Temporary Detour: Americas Trot for Hunger 5K and Little Turkey 1 Miler on November 26

Show Details
11/26/2025 11/27/2025
bus icon
D1X

Temporary Detour Temporary Detour: Americas Trot for Hunger 5K and Little Turkey 1 Miler on November 26

Show Details
11/26/2025 11/27/2025
bus icon
D30

Temporary Detour Temporary Detour: Americas Trot for Hunger 5K and Little Turkey 1 Miler on November 26

Show Details
11/26/2025 11/27/2025
bus icon
D40

Temporary Detour Temporary Detour: Americas Trot for Hunger 5K and Little Turkey 1 Miler on November 26

Show Details
11/26/2025 11/27/2025
bus icon
D44

Temporary Detour Temporary Detour: Americas Trot for Hunger 5K and Little Turkey 1 Miler on November 26

Show Details
11/26/2025 11/27/2025
bus icon
D4X

Temporary Detour Temporary Detour: Americas Trot for Hunger 5K and Little Turkey 1 Miler on November 26

Show Details
11/26/2025 11/27/2025
bus icon
D50

Temporary Detour Temporary Detour: Americas Trot for Hunger 5K and Little Turkey 1 Miler on November 26

Show Details
11/26/2025 11/27/2025
bus icon
D60

Temporary Detour Temporary Detour: Americas Trot for Hunger 5K and Little Turkey 1 Miler on November 26

Show Details
11/26/2025 11/27/2025
bus icon
D6X

Temporary Detour Temporary Detour: Americas Trot for Hunger 5K and Little Turkey 1 Miler on November 26

Show Details
11/26/2025 11/27/2025
bus icon
F62

Temporary Detour Temporary Detour: 2025 Arlington Turkey Trot on November 27

Show Details
11/27/2025 11/27/2025
bus icon
A11

Temporary Detour Temporary Detour: Alexandria Turkey Trot Del Ray 2025 on November 27

Show Details
11/27/2025 11/27/2025
bus icon
A12

Temporary Detour Temporary Detour: Alexandria Turkey Trot Del Ray 2025 on November 27

Show Details
11/27/2025 11/27/2025
bus icon
F23

Temporary Detour Temporary Detour: City of Fairfax Turkey Trot 5K on November 27

Show Details
11/27/2025 11/27/2025
bus icon
D10

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D20

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D50

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D5X

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D72

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D80

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D94

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D96

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
F19

Temporary Detour Temporary Detour: 2025 National Christmas Tree Lighting Ceremony on December 4

Show Details
12/04/2025 12/04/2025
bus icon
D96

Temporary Detour Temporary Detour: 43rd Annual Turkey Chase Charity Race on November 27

Show Details
11/27/2025 11/27/2025
bus icon
M22

Temporary Detour Temporary Detour: 43rd Annual Turkey Chase Charity Race on November 27

Show Details
11/27/2025 11/27/2025
bus icon
M70

Temporary Detour Temporary Detour: 43rd Annual Turkey Chase Charity Race on November 27

Show Details
11/27/2025 11/27/2025
bus icon
P10

Stop Relocation Permanent Bus Stop Closure: Rhode Island Ave NE at Eastern Ave on November 26

Show Details
11/26/2025 12/26/2025
bus icon
P1X

Stop Relocation Permanent Bus Stop Closure: Rhode Island Ave NE at Eastern Ave on November 26

Show Details
11/26/2025 12/26/2025
bus icon
P40

Stop Relocation Permanent Bus Stop Closure: Rhode Island Ave NE at Eastern Ave on November 26

Show Details
11/26/2025 12/26/2025
bus icon
D30

Temporary Bus Stop Temporary Bus Stop Closure: S Dakota Ave NE at Delafield St on December 5

Show Details
11/05/2025 12/08/2025
station icon
East Falls Church

Other (chillers and lighting) East Falls Church and Vienna: Bicycle Rack Removal on December 3, 2025

Show Details
11/26/2025 12/05/2025
station icon
Vienna/Fairfax-GMU

Other (chillers and lighting) East Falls Church and Vienna: Bicycle Rack Removal on December 3, 2025

Show Details
11/26/2025 12/05/2025
bus icon
P41

Temporary Detour Temporary Detour: Washington Commanders vs Denver Broncos on November 30

Show Details
11/30/2025 11/30/2025
bus icon
P61

Temporary Detour Temporary Detour: Washington Commanders vs Denver Broncos on November 30

Show Details
11/30/2025 11/30/2025