Daily Service Report Archives

Monday, September 30, 2013

5:00 a.m. A Vienna-bound Orange Line train at West Falls Church was delayed 7 minutes due to an equipment problem.

5:11 a.m. A New Carrollton-bound Orange Line train at Vienna was delayed 11 minutes due to an equipment problem.

6:23 a.m. A New Carrollton-bound Orange Line train approaching Dunn Loring experienced a brake problem, was moved to the platform and offloaded. Several trains were single tracked around the incident train and several trains were offloaded and turned back for schedule adherence/improved train spacing. Passengers experienced delays up to 45 minutes.

7:15 a.m. A Branch Avenue-bound Green Line train at Greenbelt did not operate, resulting in a 6-minute gap in service.

7:20 a.m. A Grosvenor-bound Red Line train at Gallery Place was offloaded due to a brake problem. Passengers experienced a 4-minute delay.

7:52 a.m. A Vienna-bound Orange Line train at Metro Center was offloaded due to a brake problem. Several trains were single tracked around the incident train and several trains were offloaded and turned back for schedule adherence/improved train spacing. Passengers experienced delays up to 30 minutes.

8:14 a.m. A Largo Town Center-bound Blue Line train at Arlington Cemetery was offloaded and turned back for schedule adherence/improved train spacing.

11:35 a.m. A Shady Grove-bound Red Line train at Glenmont was delayed 6 minutes due to a door problem.

12:40 p.m. A Branch Avenue-bound Green Line train at Greenbelt was delayed 4 minutes due to maintenance activity.

3:54 p.m. A Vienna-bound Orange Line train at Ballston was expressed for schedule adherence/improved train spacing.

4:00 p.m. A Vienna-bound Orange Line train at West Falls Church was offloaded due to a brake problem. Passengers experienced a 6-minute delay.

4:21 p.m. A Branch Avenue-bound Green Line train at Suitland was expressed for schedule adherence/improved train spacing.

4:42 p.m. A Franconia-Springfield-bound Blue Line train at Largo Town Center did not operate, resulting in a 6-minute gap in service.

4:50 p.m. A Glenmont-bound Red Line train at Tenleytown was offloaded due to a door problem. Passengers experienced a 6-minute delay.


Report Archives