MetroArts Art in Transit video ad

Metrobus Detours

Advisories on this page are for planned, temporary detours (including those for weekend special events and/or for longer road construction projects).

For news on permanent services changes to Metrobus routes, please see the Metrobus Route Changes page.

| 15K | 15L | 1A | 1A | 1B | 1C | 1C | 1Z | 1Z | 2A | 2B | 2C | 2G | 2T | 38B | 38B | 38B | 3A | 3B | 3E | 42 | 4A | 4B | 4B | 4E | 4H | 5A | 62 | 63 | 80 | 80 | 81 | 82 | 83 | 84 | 86 | 90 | 92 | 93 | 96 | 96 | 97 | A11 | B8 | B9 | C8 | D6 | D6 | D6 | D8 | D8 | E3 | E4 | F4 | F6 | G2 | G8 | G8 | H1 | H8 | H9 | L1 | L2 | L2 | M31 | P17 | P19 | P1 | P6 | R3 | S2 | S41 | S4 | T18 | U8 | U8 | W13 | W19 | W8 | X3 | X8 | Y5 | Y7 | Z8 |

RouteStartStopDetails
Z8 10/04/11 Until further notice

Posted 10/4/2011

Effective immediately until further notice:

Z8 - Fairland Line

Due to area construction, Metro's standard buses will not operate on Castle Blvd, north of Briggs Chaney Road.

Castle Blvd, including the bus turn-around at its north end, will be served by a small shuttle, connecting passengers from Briggs Chaney Park-and-Ride Lot.

All passengers wanting service to Castle Blvd should use the small shuttle from Briggs Chaney Park-and-Ride Lot.

The remainder of the Z8 route will continue to be served by Metro's standard buses.

1B, 1C, 2A, 2C, 2T 11/02/11 06/30/14

Joint Development Project Construction
Dunn Loring – Merrifield Station


Detour Start Date
Monday, November 7, 2011

Detour End Date
Monday, June 30, 2014

Due to construction of a joint development project at Dunn Loring-Merrifield Station, the current bus terminal and kiss & ride lot will be closed for approximately 2.5 years, starting on Monday, November 7, 2011. Metrobus will perform the following detours during this time:

1B, 2A - Westbound
• Trips to Dunn Loring will operate via regular route to Gallows Rd and Prosperity Av, then left on Prosperity Av to a temporary terminal stand west of Gallows Rd.

1B, 2A - Eastbound
• Trips leaving Dunn Loring will operate via Prosperity Av, left on Merrilee Dr, left on Lee Hwy, and continue regular route at Gallows Rd to Ballston-MU Station.

1C - Eastbound 
• Trips to Dunn Loring will operate via regular route to Gallows Rd and Prosperity Av, then left on Prosperity Av to a temporary terminal stand west of Gallows Rd. 

1C - Westbound
• Trips leaving Dunn Loring will operate via Prosperity Av, left on Merrilee Dr, left on Lee Hwy, and continue regular route at Gallows Rd to Fair Oaks Mall.

2C – Eastbound and Westbound
• Trips will serve temporary stops at a new crosswalk on Gallows Rd at Dunn Loring-Merrifield Station, then continue regular route to Ballston-MU Station or Tysons Corner.

2T - Southbound
• Trips to Dunn Loring will serve a temporary stop at a new crosswalk on southbound Gallows Rd at Dunn Loring – Merrifield Station, and then continue Gallows Rd and right onto Prosperity Av to a temporary terminal stand west of Gallows Rd.

2T - Northbound
• Trips leaving Dunn Loring will operate via Prosperity Av, left on Merrilee Drive, left on Lee Hwy, left on Gallows Rd to the temporary stop on northbound Gallows Rd opposite Dunn Loring-Merrifield Station, then continue on Gallows Rd, left on Cottage St, and continue regular route to Tysons Corner.

C8 06/14/11 03/05/12 Due to construction on the NRC Building, the north sidewalk along Marinelli Road will be closed for approximately seven (7) months. Metrobus route C8 and Ride On bus route 81 stops will be relocated to the far side of northbound Rockville Pike and far side of westbound Marinelli Road. To cross Rockville Pike customers may use the underpass to get to and from the station. The underpass is not ADA accessible. Customers that need elevator access must use the crosswalks at Rockville Pike and Marinelli Road. Please see map.
F4, F6, R3 06/14/11 Until further notice

Due to roadway reconstruction on East-West Hwy, bus stops may be impacted and be subject to closure between Riggs Rd and Queens Chapel Rd. Pay attention to any signs announcing closure and where to board the nearest bus and be safe in construction areas.

The following bus stops that are impacted are listed below:

To New Carollton Station
East-West Hwy and Riggs Road 
East-West Hwy and Ager Road
East-West Hwy and 23rd Avenue
East-West Hwy and Toledo Terrace
East-West Hwy and Prince George's Plaza

To Silver Spring Station
East-West Hwy and Prince George's Plaza
East-West Hwy and Toledo Terrace
East-West Hwy and 23rd Avenue
East-West Hwy and Ager Road
East-West Hwy and 19th Place
East-West Hwy and Riggs Road

H1, L1, P1 12/05/11 Until further notice

Roadway Construction
Effective 10/15/2011, continuing approximately 4 months
All times during service day 

Location of Detour
C St NW, between 21st St NW and Virginia Av NW (bus will not serve stops on this segment during time of detour)

Metrobus will serve the following street segments during this detour:

H1 - Southbound – toward Potomac Park; AM
• Regular route to intersection of Constitution Av NW and 21st St NW
• Constitution Av NW, between 21st St NW and 18th St NW
• 18th St NW, between Constitution Av NW and end of route at E St NW

H1 - Northbound – toward Brookland; PM
• Regular route to intersection of C St NW and 20th St NW
• 20th St NW, between C St NW and Constitution Av NW
• Constitution Av NW, between 20th St NW and 21st St NW
• Constitution Av NW, between 21st St NW and continuation of regular route

L1 - Southbound – toward Potomac Park; AM
• Regular route to intersection of Constitution Av NW and 21st St NW
• Constitution Av NW, between 21st St NW and 18th St NW
• 18th St NW, between Constitution Av NW and end of route at E St NW

L1 - Northbound – toward Chevy Chase Circle; PM
• Regular route to intersection of C St NW and 20th St NW
• 20th St NW, between C St NW and Constitution Av NW
• Constitution Av NW, between 20th St NW and 21st St NW
• Constitution Av NW, between 21st St NW and continuation of regular route

P1 – Northbound – toward Potomac Park; AM
• Regular route to intersection of Virginia Av NW and C St NW
• Virginia Av NW, between C St NW and end of route at 21st St NW

P1 – Southbound – toward Anacostia; PM
• Virginia Av NW, between start of route at E St NW and C St NW
• Virginia Av NW, between C St NW and continuation of regular route

1A, 1C, 1Z 11/17/11 Until further notice Construction at Inova Fairfax Hospital

Effective Saturday, November 19, 2011
Until Further Notice

As part of Inova Fairfax Hospital’s ongoing expansion project, the current temporary bus stop in the south parking lot will be relocated to a new three-bus pulloff on the northbound hospital access road from Woodburn Road, near side of the main hospital roadway. Buses will detour via Woodburn Road to access the temporary bus stop and return to Gallows Road via the current main hospital roadway.

Metrobus will serve the following street segments during the time of this detour:

1A, 1C, 1Z - Both Directions
• Regular route to intersection of southbound Gallows Road and main “gray” entrance roadway to Inova Fairfax Hospital
• Gallows Rd, between hospital entrance and Woodburn Rd
• Woodburn Rd, between Gallows Rd and roadway to #3340-Woodburn Center for Community Mental Health (next roadway after entrance to hospital employee lot 10)
• Roadway to #3340-Woodburn Center for Community Mental Health, between Woodburn Rd and main entrance roadway (including bus pull-out / bus stop)
• Main entrance roadway, between roadway to #3340-Woodburn Center for Community Mental Health and Gallows Rd
• Main entrance roadway, between Gallows Rd and continuation of regular route
3A, 3B, 3E, 4A, 4B, 4E, 4H, 5A, 15K, 15L, 38B 06/02/11 12/31/12 Blasting activity as part of the new elevator and office building construction will occur at the Rosslyn Metrorail Station starting in late March 2011 continuing through January 2012. As a result, North Moore Street may be shut down for approximately six minutes. Passengers will not be allowed to access bus bays at Rosslyn Metrorail Station during blasting. In the case of any perimeter restrictions in regards to blasting, passengers will be directed to board buses on 19th Street North and North Lynn Street. The Fort Myer Entrance will remain open at all times. Please sign for up for notifications at arlingtonalert.com for more details.
U8 12/05/11 04/01/12

Roadway Construction
Effective immediately until March 31, 2012
All times during service day

Location of Detour
DC - Benning Rd NE, between 39th St NE and 42nd St NE

Due to roadway reconstruction on Benning Road, NE, between 39th Street NE and 42nd Street NE, bus stops may be impacted and be subjected to closure. Please pay attention to any signs announcing closure and where to board the nearest bus and be safe in construction zones while waiting for Metrobus routes.

D6 02/02/12 02/05/12 Heavy Crane Lifting Operation
Saturday, February 4, 2012
12:01am – 11:59pm

Location of Event
DC – 13th St NW, between G St NW and H St NW

Metrobus will run the following street segments during the detour:

D6 – Eastboundtoward Stadium/Armory
• Regular route to intersection of K St NW and 14th St NW
• 14th St NW, between K St NW and G St NW
• G St NW, between 14th St NW and 13th St NW
• 13th St NW, between G St NW and continuation of regular route

D6 – Westbound toward Sibley Hospital
• Regular route to intersection of 13th ST NW and G St NW
• G St NW, between 13th St NW and 14th St NW
• 14th St NW, between G St NW and K St NW
• K St NW, between 14th St NW and continuation of regular route
U8 01/10/11 Until further notice Roadway Construction
Effective January 10, 2011, until further notice
All times during service day


Location of Detour
DC – Eastbound Nannie Helen Burroughs Av NE, between Minnesota Av NE and 44th St NE

To Benning Heights via Minnesota Av Metrorail Station

• Regular route; No detour

To Capitol Heights Metrorail Station
• Regular route to intersection of Minnesota Av NE and Hunt Pl NE
• Hunt Pl NE, between Minnesota Av NE and Nannie Helen Burroughs Av NE
• Nannie Helen Burroughs Av NE, between Hunt Pl NE and continuation of regular route

The following bus stops will be closed
• Nannie Helen Burroughs Av NE and 44th St NE (Eastbound, nearside)
• Nannie Helen Burroughs Av NE and Hayes St NE (Eastbound, nearside)
• Minnesota Av NE and Nannie Helen Burroughs Av NE (Eastbound, nearside)

The following temporary bus stops will be added
• Hunt Pl NE and Minnesota Av NE (Eastbound, farside) – 70 feet from intersection
• Hunt Pl NE and 44th St NE (Eastbound, nearside) - @ Intersection
42, S2, S4, G8, P17, P19, W13, 80 06/02/11 03/31/14 Due to a major construction project taking place, effective March 21, 2011 through March 31, 2014, the bus stop at the corner of 11th Street between H Street and I (Eye) Street NW will be relocated next to Grand Hyatt on 11th Street near the taxicab stand in between H Street and G Street, NW.
1A, 1Z, 2B, 2G 01/31/12 Until further notice

Construction at Vienna/Fairfax - GMU Station
Beginning Tuesday, January 31, 2011
Until Further Notice
All Times Each Day

Location of Event
Vienna/Fairfax - GMU Metro Station

Metrobus will run the following detour:

1A, 1Z – Westbound 
From northbound Nutley St 
• Left onto Lee Hwy
• Right onto Vaden Dr
• Left onto Saintsbury Dr
• Right onto I-66
• Right at exit 62A
• Right toward Vienna Metro Station  
• Continue on Saintsbury Dr
• Right into Vienna Station

1A, 1Z – Eastbound
From Terminal Rdwy
• Left onto Saintsbury Dr
• Right onto Nutley St
• Continue regular route to Ballston

2B, 2G – Westbound
From northbound Lee Hwy
• Continue Lee Hwy (at Nutley St)
• Right onto Vaden Dr
• Left onto Saintsbury Dr
• Right onto I-66
• Right at exit 62A
• Right toward Vienna Metro Station
• Continue on Saintsbury Dr
• Right into Vienna Station
• Continue on Terminal Rdwy
• Right onto Saintsbury Dr
• Left onto Vaden Dr
• Right onto Lee Hwy
• Continue regular route to Fair Oaks Mall

2B, 2G – Eastbound
From eastbound Lee Hwy
• Left onto Vaden Dr 
• Left onto Saintsbury Dr
• Right onto I-66
• Right at exit 62A
• Right toward Vienna Metro Station
• Continue on Saintsbury Dr
• Right into Vienna Station 
• Continue on Terminal Rdwy
• Left onto Saintsbury Dr
• Right onto Nutley St
• Left onto Lee Hwy
• Continue regular route to Ballston

W99 West Ox Shuttle – Eastbound and Westbound
• Regular route; No detour

Bus stop changes
• On Nutley St. at Hermosa Dr northbound – temporarily discontinued
• On Nutley St. at Lee Hwy northbound (south of entrance to Wells Fargo Bank) – this stop may need to be relocated south to a point at or near the south shopping center entrance (Micro Center) to accommodate the left turn to Lee Hwy
• On Lee Hwy at Nutley St westbound (far side stop) – 1A,Z should serve this stop if safe to do so after the left turn from Nutley

NOTE: Fairfax County has requested that the detour routing via Vaden Dr to and from Lee Hwy be made permanent for the 2B and 2G. A determination will be made sometime before the March opening of the temporary bus terminal on the south side of Saintsbury Dr

62, 63 06/02/11 03/31/14
  • Due to roadway reconstruction on Georgia Avenue, NW, bus stops on Routes 62 and 63 may be impacted and be subjected to closure between Webster Street, NW and Otis Street, NW. Please pay attention to any signs announcing closure and where to board the nearest bus and be safe in construction zones while waiting for Metrobus routes. This is in effect immediately until December 31, 2011.
  • Due to roadway reconstruction on Sherman Avenue, NW, bus stops may be impacted and be subjected to closure between Park Road and Florida Avenue, NW. Please pay attention to any signs announcing closure and where to board the nearest bus and be safe in construction zones while waiting for Metrobus routes. This is in effect immediately until December 31, 2012.
  • Due to a major construction project taking place, effective March 21, 2011 through March 31, 2014, the bus stop at the corner of 11th Street between H Street and I (Eye) Street NW will be relocated next to Grand Hyatt on 11th Street near the taxicab stand in between H Street and G Street, NW.
A11 06/02/11 Until further notice Due to utility construction on Addison Road this route will be detoured until further notice, following the routing listed below:
From normal route on Martin Luther King Jr Highway
Left on 68th Street
Left on James Farmer Way
Right on Addison Road
To normal route on Addison Road
W8 06/02/11 Until further notice Due to construction at the corner of 16th Street SE and Galen Street SE, this bus stop has be temporarily closed. Please board Route W6 buses at the corner of 16th Street SE and Bangor Street SE. This will be in place until further notice.
G8 06/02/11 Until further notice Due to construction of a new hotel at the corner of 9th Street NW and L Street NW, this bus stop has been relocated to 9th Street NW and M Street NW. The bus stop at 9th Street NW and Massachusetts Avenue has been closed and relocated to 9th Street NW and K Street NW. This will be in place until further notice.
W19 11/17/11 Until further notice

Re-Location of Bryans Road Park-and-Ride Lot

Effective Monday, November 21, 2011
Continuing until further notice

Location of Event
Bryans Rd, MD – Bryans Road Park-and-Ride Lot  

Beginning Monday, November 21, 2011, the Bryans Road Park-and-Ride Lot behind the Volunteer Fire Department will be relocated to the Food Lion lot at 2960 Marshall Hall Rd, Bryans Road, MD. This is due to a construction project at the Fire Department facility.

Y5, Y7 12/15/11 Until further notice

ICC Park-and-Ride Lot / Norbeck Park-and-Ride Lot
Effective December 15, 2011, until further notice

Construction of the new ICC Park-and-Ride lot is behind schedule.  It will NOT be open by its original planned completion date of December 18, 2011.  Therefore, Y5 and Y7 buses will continue to use the current Norbeck Park-and-Ride lot until further notice.

G2 06/27/11 08/30/12 Starting on June 27, 2011, due to a long term roadway construction project along O and P Streets, route G2 will not serve the following stops listed below: 

Westbound - P @ 33rd Streets, NW, Nearside
Westbound - P @ 34th Streets, NW, Nearside
Westbound - P @ 35th Streets, NW, Nearside
Southbound - 37th @ O Streets, NW, Midblock
Eastbound - Prospect @ 35th Streets, NW, Nearside
Northbound - 35th @ N Streets, NW, Nearside
Eastbound - O @ 34th Streets, NW, Nearside
Eastbound - O @ 33rd Streets, NW Nearside

Please board this route at the corner of Dumbarton Street @ Wisconsin Avenue next to Five Guys.  Service will resume at this bus stop in summer 2012.  There will be no direct service to Georgetown University as a result of this detour, however, it is a short five block walk via O Street, NW. Metro apologizes for any inconvenience this may cause.

4B, 38B 08/10/11 Until further notice

Due to a Clarendon Boulevard construction site collapse, Clarendon Blvd. eastbound from N. Pierce St. to N. Oak St. is closed. This closure will remain in effect for several days.  Those destined for Rosslyn should expect congestion/delays.

Transit, pedestrian and bicycle routes also are affected. Metrobus routes 4B and 38B are detoured; delays may occur.

The following local roads also are closed: 16th Rd. from N. Pierce St. to N. Oak St. and N. Ode St. from Clarendon Blvd. to 16th Rd.

96, 97, D6, D8, X8 08/26/11 Until further notice

Columbus Circle Re-Construction 
Sunday, September 11, 2011, and continuing until further notice 
Daily, until further notice

Location of Event
DC – Columbus Circle – Massachusetts Av NE, between 1st St NE and 2nd St NE 
 
On or about September 11, 2011, the District Department of Transportation (DDOT) will begin reconstruction of Columbus Plaza in front of Union Station. During construction, which is expected to last approximately 18 months, traffic congestion is anticipated to cause significant delays for vehicles traveling through the plaza. In addition, the bus stop and terminal stand for Routes 97, D8, and X8 in the plaza and the westbound stop on Columbus Circle (Union Station Plaza outer roadway) for Routes 96 and D6 will be closed for construction.

In order to maintain Metrobus service to Union Station safely and efficiently, the stop and terminal stand for Routes 97, D8, and X8 will be relocated to the south side of Massachusetts Avenue NE between North Capitol Street and 1st St NE. Also, westbound Route D6 will be re-routed to serve a new stop on the north side of E Street NE, east of North Capitol Street.

Metrobus will serve the following street segments during the detour:

96 – Westbound
• Westbound bus stop on Columbus Circle will be closed during construction.
• Regular route; No detour

96 – Eastbound
• Regular route; No detour

97 – Westbound
• Regular route to the intersection of Louisiana Av and North Capitol St
• North Capitol St, between Louisiana Av and Massachusetts Av
• Massachusetts Av NE, between North Capitol St and new terminal stand just east of North Capitol St

97 – Eastbound
• Massachusetts Av NE, between new terminal stand just east of North Capitol St and Columbus Circle
• E St NE, between Columbus Circle and North Capitol St
• North Capitol St, between E St and Louisiana Av
• Louisiana Av NW, between North Capitol St and continuation of regular route

D6 – Westbound
• Regular route to intersection of Columbus Circle and E St NE
• Westbound bus stop on Columbus Circle will be closed during construction.
• E St NE, between Columbus Circle and North Capitol St (new bus stop located on this segment)
• E St NE, between North Capitol St NE and continuation of regular route

D6 – Eastbound
• Regular route; No detour

D8 – Southbound
• Regular route to new terminal stand on Massachusetts Av NE just east of North Capitol St

D8 – Northbound
• Massachusetts Av NE, between new terminal stand just east of North Capitol St and Columbus Circle
• E St NE, between Columbus Circle and North Capitol St
• North Capitol St, between E St and Massachusetts Av
• North Capitol St, between Massachusetts Av and continuation of regular route

X8 – Westbound
• Regular route to intersection of Massachusetts Av NE and Columbus Circle
• E St NE, between Columbus Circle and North Capitol St
• North Capitol St, between E St and Massachusetts Av
• Massachusetts Av NE, between North Capitol St and new terminal stand just east of North Capitol St

X8 – Eastbound
• Massachusetts Av NE, between new terminal stand just east of North Capitol St and Columbus Circle
• Massachusetts Av NE, between Columbus Circle and D St NE
• Massachusetts Av NE, between D St NE and continuation of regular route

81, 82, 83, 84, 86, B8, B9, D8, H8, H9, P6, M31, S41, T18 06/09/11 Until further notice Due to construction at the Rhode Island Ave-Brentwood Metrorail Station, the bus bays have been reassigned for this route. Please click here for a map of where the buses are stopping.
38B, 80, D6, L2 02/03/12 02/04/12 Heavy Crane Lifting Operation
Saturday, February 4, 2012
7:00am – 7:00pm

Location of Event
DC – K St NW, between Connecticut Av NW and 18th St NW

Metrobus will run the following street segments during the detour:

38B – Eastbound – toward Farragut Square
• Regular route to intersection of K St NW and 18th St NW
• 18th St NW, between K St NW and L St NW
• L St NW, between 18th St NW and Connecticut Av NW
• Connecticut Av NW, between L St NW and K St NW
• K St NW, between Connecticut Av NW and continuation of regular route

38B – Westbound – toward Ballston
• Regular route; No detour

80 – Northbound – toward Fort Totten
• Regular route to intersection of K St NW and 18th St NW
• 18th St NW, between K St NW and L St NW
• L St NW, between 18th St NW and Connecticut Av NW
• Connecticut Av NW, between L St NW and K St NW
• K St NW, between Connecticut Av NW and continuation of regular route

80 – Southbound – toward Kennedy Center
• Regular route to intersection of K St NW and Connecticut Av NW / 17th St NW (west)
• 17th St NW (west), between K St NW and I (Eye) St NW
• I (Eye) St NW, between 17th St NW (west) and 19th St NW
• 19th St NW, between I (Eye) St NW and continuation of regular route

D6 – Eastbound – toward Stadium/Armory
• Regular route to intersection of 21st St NW and L St NW
• L St NW, between 21st St NW and Connecticut Av NW
• Connecticut Av NW, between L St NW and K St NW
• K St NW, between Connecticut Av NW and continuation of regular route

D6 – Westbound – toward Sibley Hospital
• Regular route to intersection of K St NW and Connecticut Av NW / 17th St NW (west)
• 17th St NW (west), between K St NW and I (Eye) St NW
• I (Eye) St NW, between 17th St NW (west) and 20th St NW
• 20th St NW, between I (Eye) St NW and K St NW
• 20th St NW, between K St NW and continuation of regular route

L2 – Southbound – toward McPherson Square
• Regular route to intersection of 21st St NW and L St NW
• L St NW, between 21st St NW and Connecticut Av NW
• Connecticut Av NW, between L St NW and K St NW
• K St NW, between Connecticut Av NW and continuation of regular route

L2 – Northbound – toward Chevy Chase Circle
• Regular route to intersection of K St NW and Connecticut Av NW / 17th St NW (west)
• 17th St NW (west), between K St NW and I (Eye) St NW
• I (Eye) St NW, between 17th St NW (west) and 20th St NW
• 20th St NW, between I (Eye) St NW and K St NW
• 20th St NW, between K St NW and continuation of regular route
E3, E4 02/03/12 02/10/12 Roadway Construction
Monday, February 6 – Friday, February 10
7:00am Monday – 7:00pm Friday

Location of Event
DC – Intersection of Riggs Rd NE and Chillum Pl NE

Metrobus will run the following street segments during the detour:

E3, E4 – Eastbound – toward Riggs Park
• Regular route to intersection of Riggs Rd NE and Red Line overpass
• Kennedy St NE, between South Dakota Av NE and Chillum Pl NE
• Chillum Pl NE, between Kennedy St NE and continuation of regular route

E3, E4 – Westbound – toward Fort Totten
• Regular route; No detour
90, 92, 93, 96, L2, X3 12/09/11 Until further notice Roadway Construction
Effective immediately through mid-summer 2012
All times during service day

Location of detour
DC – 18th St NW, between U St NW / Florida Av NW and Columbia Rd NW / Adams Mill Rd NW 

Metrobus will run the following street segments during this detour:

90, 92, 93 – Northbound – toward Duke Ellington Bridge
• Regular route to intersection of U St NW and 18th St NW
• Florida Av NW, between 18th St NW and T St NW
• T St NW, between Florida Av NW and Connecticut Av NW
• Connecticut Av NW, between T St NW and Columbia Rd NW
• Columbia Rd NW, between Connecticut Av NW and Adams Mill Rd NW
• Adams Mill NW, between Columbia Rd NW and continuation of regular route

90, 92, 93 – Southbound – toward Anacostia / Congress Heights
• Regular route to intersection of Adams Mill Rd NW and Columbia Rd NW
• Columbia Rd NW, between Adams Mill Rd NW and Connecticut Av NW
• T St NW, between Connecticut Av NW and Florida Av NW
• Florida Av NW, between T St NW and 18th St NW
• U St NW, between 18th St NW and continuation of regular route

96 – Westbound – toward McLean Gardens
• Regular route to intersection of U St NW and 18th St NW
• Florida Av NW, between 18th St NW and T St NW
• T St NW, between Florida Av NW and Connecticut Av NW
• Connecticut Av NW, between T St NW and Columbia Rd NW
• Columbia Rd NW, between Connecticut Av NW and Adams Mill Rd NW
• Adams Mill NW, between Columbia Rd NW and continuation of regular route

96 – Eastbound – toward Capitol Heights
• Regular route to intersection of Adams Mill Rd NW and Columbia Rd NW
• Columbia Rd NW, between Adams Mill Rd NW and Connecticut Av NW
• T St NW, between Connecticut Av NW and Florida Av NW
• Florida Av NW, between T St NW and 18th St NW
• U St NW, between 18th St NW and continuation of regular route

L2 – Northbound – toward Chevy Chase Circle
• Regular route to intersection of 18th St NW and Florida Av NW
• Florida Av NW, between 18th St NW and T St NW
• T St NW, between Florida Av NW and Connecticut Av NW
• Connecticut Av NW, between T St NW and Columbia Rd NW
• Columbia Rd NW, between Connecticut Av NW and Adams Mill Rd NW
• Adams Mill NW, between Columbia Rd NW and continuation of regular route

L2 – Southbound – toward McPherson Square
• Regular route to intersection of Adams Mill Rd NW and Columbia Rd NW
• Columbia Rd NW, between Adams Mill Rd NW and Connecticut Av NW
• T St NW, between Connecticut Av NW and Florida Av NW
• Florida Av NW, between T St NW and 18th St NW
• 18th St NW, between Florida Av NW and continuation of regular route

X3 – Westbound – toward McLean Gardens
• Regular route to intersection of U St NW and 18th St NW
• Florida Av NW, between 18th St NW and T St NW
• T St NW, between Florida Av NW and Connecticut Av NW
• Connecticut Av NW, between T St NW and Columbia Rd NW
• Columbia Rd NW, between Connecticut Av NW and Adams Mill Rd NW
• Adams Mill NW, between Columbia Rd NW and continuation of regular route

X3 – Eastbound – toward Minnesota Av
• Regular route to intersection of Adams Mill Rd NW and Columbia Rd NW
• Columbia Rd NW, between Adams Mill Rd NW and Connecticut Av NW
• T St NW, between Connecticut Av NW and Florida Av NW
• Florida Av NW, between T St NW and 18th St NW
• U St NW, between 18th St NW and continuation of regular route

© 2012 Washington Metropolitan Area Transit Authority